  • Things to go into cesm3_0_beta10

    Due by July 31, 2026
  • Freeze of FATES version in CTSM5.4 until ctsm6.0.000 FATES changes will go onto fates-dev during this period The FATES maint-version branch may be updated with required bug-fixes during this period Documentation on the process: https://docs.google.com/document/d/1LOxCUZXWPjDGldrd2aJmsGjIVjKOS8-oBBvG5nk_ElU/edit?tab=t.0

    Due by May 13, 2026
    5/12 issues closed
  • Things we need to get into the cesm3_0_beta09 tag

    Due by May 29, 2026
    20/32 issues closed
  • Things to accomplish by the June CESM workshop in order to report on them.

    Due by June 15, 2026
    0/5 issues closed
  • This hasn't been prioritized yet, but this is something that we think really should happen. In order for it to really happen it needs to be moved into a tangible milestone. So putting it here means it's probably longer timescale than the existing milestones. As it isn't a more immediate priority, or we don't have the bandwidth to handle it, but we do think it's important to do at least long term. In many cases it's something we'd like to do NOW, but know it's not important enough to do immediately in order to get the true near term priorities done. In Scrum Agile Software Development Methodology (SDM) terminology this is something in the "Backlog".

    Due by December 31, 2040
    6/66 issues closed
  • Post cesm3.0 science and software developments into the CESM release series. Things that we want to see in the ctsm7.0.000 tag and release-clm7.0 tag on main. Which will be the starting point for the CESM4.0.0 release branch. This will be marked as a release.

    Due by December 12, 2030
    2/52 issues closed
  • Post cesm3.0/ctsm6.0.0 developments. Things that we want to see in the ctsm6.1.000 tag and release-clm6.1 tag on main. This will be marked as a release.

    Due by March 26, 2027
    3/58 issues closed
  • Freeze for the list of scientifically supported compsets for CTSM for I compsets Sp FatesNoComp FatesSP MizuRoute Hillslope all need to be frozen for answer changes by this date. Bgc and BgcCrop already frozen in beta08 We will allow non-standard things that are default off to change answers. But, everything that will affect CTSM simulations MUST not-change answers without approval.

    Due by June 30, 2026
    48/77 issues closed
  • This is the tag on the ctsm6.0 release-cesm3.0 branch (from release-ctsm6.0) that will be used in the actual CESM3.0.0 release given to the public. Science MUST be ALL done at this point. Limited Bug fixes approved by the entire CESM project and CESM SSC is required for anything that changes answers.

    Due by September 30, 2026
    22/62 issues closed
  • Things that we want to see in the ctsm6.0.000 tag and release-clm6.0 tag on main. Which will be the starting point for the CESM3.0.0 release branch. This will be marked as a release.

    Due by September 1, 2026