Current Status: ~40% complete with 3 production-ready components (JS runtime, Webview, Python runtime with CGO)
Major Gaps: 8 language runtimes are stubs, Phase 4 infrastructure is mocked, CLI needs work
- Basic command structure (
init,build,dev,test,version) - Simple project scaffolding
- File generation for basic projects
Current: Creates basic directory structure with template files
Needed:
- Interactive project wizard (language selection, template choice)
- Multiple project templates (web app, CLI tool, system utility)
- Dependency detection and installation guidance
- Configuration file generation (
polyglot.config.jsonor similar) - Git initialization with
.gitignore - README generation with project-specific info
Estimated Effort: 2-3 weeks
Current: Simple go build wrapper
Needed:
- Intelligent runtime detection (auto-enable based on imports)
- Build tag management (automatically add
-tagsfor enabled runtimes) - Platform-specific builds (handle WebKitGTK on Linux, WebView2 on Windows)
- Dependency checking (verify Python headers, WebKitGTK, etc.)
- Build caching to speed up incremental builds
- Cross-compilation support (
polyglot build --platform darwin --arch arm64) - Binary optimization (strip symbols, compress, etc.)
- Asset bundling (embed frontend files)
Estimated Effort: 3-4 weeks
Current: Just calls build
Needed:
- Real hot reload for Go code (restart on changes)
- Frontend hot reload (inject changes without restart)
- Python module reloading (reimport on change)
- JavaScript context refresh
- File watching with debouncing
- Error display in terminal with file/line numbers
- Live log streaming
- DevTools auto-open option
Estimated Effort: 2-3 weeks
Current: Runs go test ./...
Needed:
- Test discovery across all runtimes
- Python test runner integration (pytest)
- JavaScript test runner (if using separate JS tests)
- Coverage reporting (combined across languages)
- Benchmark running and comparison
- CI/CD template generation (GitHub Actions, GitLab CI)
Estimated Effort: 2 weeks
Current: None
Needed:
polyglot add <runtime> <package>(install Python pip packages, npm packages, etc.)polyglot remove <runtime> <package>- Unified lock file (tracks versions across all runtimes)
- Dependency resolution
- Virtual environment management (Python venv, node_modules)
- Dependency tree visualization
- Security audit integration
Estimated Effort: 3-4 weeks
Current: None
Needed:
polyglot info- show project stats, enabled runtimes, dependenciespolyglot doctor- health check, verify all dependenciespolyglot upgrade- update polyglot framework itselfpolyglot clean- clear caches, build artifactspolyglot format- run formatters (gofmt, black, prettier)
Estimated Effort: 1-2 weeks
TOTAL CLI EFFORT: 13-18 weeks (3-4.5 months)
- Interface definition
- Loader skeleton with
dlopen/dlsymCGO code - Stub implementation for testing
- Basic test structure
Needed:
- Compile Rust to shared library (
.so/.dll/.dylib) - Dynamic library loading and symbol resolution
- FFI interface definition (C ABI bridge)
- Memory management across FFI boundary
- Error handling and propagation
- Panic catching and recovery
- Thread safety guarantees
Estimated Effort: 3-4 weeks
Needed:
- Cargo integration (run
cargo buildfrom Go) - Automatic library path resolution
- Platform-specific library naming (
.sovs.dllvs.dylib) - Rust dependency management
- Build caching
- Cross-compilation support
Estimated Effort: 2 weeks
Needed:
- Go → Rust type conversion (integers, strings, structs)
- Rust → Go type conversion
- Complex types (Vec, HashMap, Option, Result)
- Ownership semantics handling
- Lifetime management
- Zero-copy optimization where possible
Estimated Effort: 2-3 weeks
Needed:
- Async/await support (Tokio runtime)
- Callback support (Rust calling Go)
- Trait object handling
- Generic function support
- Macro expansion support (if needed)
Estimated Effort: 3-4 weeks
TOTAL RUST EFFORT: 10-13 weeks (2.5-3 months)
- Interface definition
- Worker pool skeleton
- Stub implementation
- Test structure
Needed:
- JVM initialization and lifecycle management
- JNI CGO bindings
- Class loading mechanism
- Method invocation (static and instance)
- Field access
- Exception handling and propagation
- Reference management (local/global refs)
Estimated Effort: 4-5 weeks
Needed:
- Java compilation (
javacintegration) - JAR file generation
- Classpath management
- Maven/Gradle integration (optional)
- Dependency resolution
- Native library inclusion
Estimated Effort: 2 weeks
Needed:
- Primitive type conversion
- String handling (Java String ↔ Go string)
- Array and collection conversions
- Object serialization
- Custom type mapping
Estimated Effort: 2-3 weeks
Needed:
- JIT compilation utilization
- Method caching
- Thread pool for JNI operations
- GC tuning guidance
- Profiling integration
Estimated Effort: 2 weeks
TOTAL JAVA EFFORT: 10-12 weeks (2.5-3 months)
- Interface definition
- Loader with
dlopenCGO - Stub implementation
Needed:
- C++ compilation to shared library
- Symbol resolution and caching
- Name mangling handling (extern "C")
- Exception boundary handling
- RTTI support (if needed)
Estimated Effort: 2-3 weeks
Needed:
- CMake integration
- Compiler detection (g++, clang++)
- Include path management
- Library linking
- Platform-specific flags
- C++ standard selection (C++11/14/17/20)
Estimated Effort: 2 weeks
Needed:
- RAII integration
- Smart pointer handling
- Manual memory cleanup hooks
- Leak detection
- Cross-boundary ownership rules
Estimated Effort: 2 weeks
Needed:
- Template instantiation support
- Virtual function calling
- Multiple inheritance handling
- STL container conversion
- Lambda/function object support
Estimated Effort: 3 weeks
TOTAL C++ EFFORT: 9-10 weeks (2-2.5 months)
- Interface definition
- Worker pool skeleton
- Stub implementation
Needed:
- libphp CGO bindings
- PHP interpreter initialization
- Script execution mechanism
- Request context simulation (SAPI)
- Output buffering
- Error capture
Estimated Effort: 3-4 weeks
Needed:
- Composer integration
- Autoloading support
- Extension loading
- INI configuration
- Session handling (if needed)
Estimated Effort: 2 weeks
Needed:
- PHP array ↔ Go slice/map
- Object serialization
- Resource handling
- NULL/nil handling
Estimated Effort: 1-2 weeks
TOTAL PHP EFFORT: 6-8 weeks (1.5-2 months)
- Interface definition
- Worker pool skeleton
- Stub implementation
Needed:
- libruby CGO bindings
- Ruby VM initialization
- Script evaluation
- GVL (Global VM Lock) management
- Require path management
Estimated Effort: 3-4 weeks
Needed:
- Gem integration
- Bundler support
- Native extension handling
- C extension compilation
Estimated Effort: 2 weeks
Needed:
- Ruby object → Go conversion
- Method calling (with blocks)
- Symbol/String handling
- Exception mapping
Estimated Effort: 2 weeks
TOTAL RUBY EFFORT: 7-8 weeks (1.75-2 months)
- Interface definition
- State management skeleton
- Stub implementation
Needed:
- Lua C API CGO bindings
- State creation and management
- Script execution
- Stack manipulation utilities
- Garbage collection integration
Estimated Effort: 2-3 weeks
Needed:
- LuaRocks integration
- Package path management
- C module loading
- Custom module registration
Estimated Effort: 1 week
Needed:
- Table ↔ Map/Slice conversion
- Userdata for Go objects
- Metatable handling
- Coroutine support (optional)
Estimated Effort: 1-2 weeks
TOTAL LUA EFFORT: 4-6 weeks (1-1.5 months)
- Interface definition
- Loader skeleton
- Stub implementation
Needed:
- Zig compilation to shared library
- C ABI integration
- Build system integration (
zig build) - Cross-compilation support
Estimated Effort: 2-3 weeks
Needed:
- Type conversion (Zig ↔ Go)
- Error union handling
- Optional type support
- Slice/array conversion
- Struct packing alignment
Estimated Effort: 2 weeks
Needed:
- Comptime execution support
- Generic function instantiation
- Async/await integration
Estimated Effort: 2 weeks
TOTAL ZIG EFFORT: 6-7 weeks (1.5-1.75 months)
- Interface definition
- Engine skeleton
- Stub implementation
Needed:
- WASM bytecode parser
- Interpreter or JIT compiler
- Memory model implementation
- Import/export handling
- Table and function references
Estimated Effort: 6-8 weeks (or use existing library like Wasmer/Wasmtime)
Needed:
- WASI system calls
- File system abstraction
- Environment variables
- Standard I/O
Estimated Effort: 2-3 weeks
Needed:
- Module loading
- Instantiation
- Function calling
- Memory sharing
Estimated Effort: 2 weeks
TOTAL WASM EFFORT: 10-13 weeks (2.5-3 months) if building from scratch
OR: 2-3 weeks if using existing library
- Interface definition
- Stub implementation
- Dependency on
yaegiinterpreter already in go.mod
Needed:
- Yaegi interpreter setup
- Code execution
- Import system
- Standard library access
- Symbol export/import
Estimated Effort: 2-3 weeks
Needed:
- Go module support
- Dependency resolution
- Build cache integration
Estimated Effort: 1-2 weeks
TOTAL GO RUNTIME EFFORT: 3-5 weeks (0.75-1.25 months)
- Build tags for selective compilation
- Basic Go build integration
- Stub fallback system
Needed:
- Scan code for runtime imports
- Auto-enable build tags
- Dependency verification
- Platform-specific handling
- Error messages for missing dependencies
Estimated Effort: 2 weeks
Needed:
- Target platform selection
- Cross-compiler setup (for CGO)
- Platform-specific library bundling
- Automated testing on target platforms
- Docker-based builds for consistent environments
Estimated Effort: 3-4 weeks
Needed:
- Dead code elimination
- Binary size optimization (UPX, strip)
- Runtime selection at build time (only include used runtimes)
- Asset compression and embedding
- Build parallelization
Estimated Effort: 2 weeks
TOTAL BUILD SYSTEM EFFORT: 7-8 weeks (1.75-2 months)
- File watching with fsnotify
- Basic reload hooks
- Interface definition
Needed:
- Python module reloading (importlib.reload)
- JavaScript context refresh
- Go code hot swap (challenging - may need process restart)
- State preservation across reloads
- Connection management (WebSocket for frontend)
Estimated Effort: 3-4 weeks
Needed:
- Dependency graph analysis
- Minimal reload scope
- Error recovery (rollback on failure)
- State serialization/deserialization
- Reload confirmation/testing
Estimated Effort: 2-3 weeks
TOTAL HMR EFFORT: 5-7 weeks (1.25-1.75 months)
- Profiler interface
- Basic metric tracking structure
- Mock implementation
Needed:
- CPU profiling per runtime
- Memory profiling per runtime
- Function-level timing
- Call graph generation
- Flame graph generation
- Cross-runtime call tracking
Estimated Effort: 3-4 weeks
Needed:
- pprof integration for Go
- cProfile integration for Python
- V8 profiler integration for JavaScript
- Unified output format
- Web-based visualization
- Export to standard formats (JSON, protobuf)
Estimated Effort: 2-3 weeks
TOTAL PROFILER EFFORT: 5-7 weeks (1.25-1.75 months)
- Policy interface
- Sandbox interface
- Platform-specific enforcer skeletons
Needed:
- Landlock LSM integration
- File system restrictions
- Network restrictions
- System call filtering (seccomp-bpf)
- Capability dropping
Estimated Effort: 3-4 weeks
Needed:
- Entitlements configuration
- Container directory setup
- Powerbox for file access
- Network restrictions
Estimated Effort: 2-3 weeks
Needed:
- AppContainer creation
- Capability configuration
- Named object isolation
- Lowbox token setup
Estimated Effort: 3-4 weeks
Needed:
- Python module import restrictions
- JavaScript eval restrictions
- File system access control per runtime
- Network access control per runtime
Estimated Effort: 2 weeks
TOTAL SECURITY EFFORT: 10-13 weeks (2.5-3 months)
- Interface definitions
- Mock registry
- Mock client
- Basic cache implementation
Needed:
- Database design (PostgreSQL/MongoDB)
- REST API server
- Package upload system
- Version management
- Search functionality (Elasticsearch?)
- User authentication
- Rating/review system
Estimated Effort: 6-8 weeks
Needed:
- Package specification (manifest format)
- Dependency resolution algorithm
- Package validation
- Security scanning
- License compliance checking
- Digital signatures
Estimated Effort: 3-4 weeks
Needed:
- HTTP client for registry API
- Download with progress
- Signature verification
- Installation process
- Conflict resolution
- Rollback capability
Estimated Effort: 3 weeks
Needed:
- Template format specification
- Variable substitution
- File generation
- Template validation
- Template marketplace
Estimated Effort: 2-3 weeks
TOTAL MARKETPLACE EFFORT: 14-18 weeks (3.5-4.5 months)
- Interface definitions
- Mock client
- Mock builder
- Mock storage
Needed:
- Build server implementation
- Container orchestration (Docker/K8s)
- Build queue management
- Platform-specific build environments
- Build caching
- Artifact storage (S3/GCS)
- Build logs and status
Estimated Effort: 8-10 weeks
Needed:
- User registration/login
- API key management
- OAuth integration
- Team/organization support
- Permission system
Estimated Effort: 4-5 weeks
Needed:
- Artifact storage (S3-compatible)
- CDN integration
- Version management
- Retention policies
- Access control
Estimated Effort: 3-4 weeks
Needed:
- REST/gRPC API
- WebSocket for real-time updates
- Rate limiting
- Usage tracking
- Billing integration
Estimated Effort: 4-5 weeks
TOTAL CLOUD EFFORT: 19-24 weeks (4.75-6 months)
- Interface definitions
- Platform-specific stubs
Needed:
codesignintegration- Certificate management
- Notarization support (notarytool)
- Entitlements handling
- Universal binary signing
- DMG creation and signing
Estimated Effort: 2-3 weeks
Needed:
- SignTool integration
- Certificate storage (Azure Key Vault)
- Authenticode signing
- MSI/MSIX packaging
- Installer signing
Estimated Effort: 2-3 weeks
Needed:
- GPG signing
- AppImage signing
- DEB/RPM signing
- Flatpak/Snap signing
Estimated Effort: 2 weeks
TOTAL SIGNING EFFORT: 6-8 weeks (1.5-2 months)
- Interface definitions
- Mock diff/patch
- Mock downloader
- Mock verifier
Needed:
- Binary diffing algorithm (bsdiff/courgette)
- Patch generation
- Patch application
- Compression (zstd/brotli)
- Delta testing
Estimated Effort: 3-4 weeks
Needed:
- Update checking
- Background downloading
- Progress UI
- Signature verification
- Rollback on failure
- A/B testing support
Estimated Effort: 3-4 weeks
Needed:
- Update manifest generation
- Version management
- Staged rollouts
- Analytics integration
- Rollback management
Estimated Effort: 3-4 weeks
TOTAL UPDATE EFFORT: 9-12 weeks (2.25-3 months)
- README files for components
- Build guides
- Example READMEs
- CONTRIBUTING.md
Needed:
- Getting started guide
- Tutorial series (beginner to advanced)
- API reference (auto-generated from code)
- Best practices guide
- Performance tuning guide
- Troubleshooting guide
- FAQ
Estimated Effort: 4-5 weeks
Needed:
- Architecture deep dive
- Runtime implementation guide
- Contributing guide enhancement
- Code style guide
- Testing guide
- Release process
Estimated Effort: 2-3 weeks
Needed:
- Simple counter app (exists)
- Todo app with persistence
- Real-time chat app
- Data visualization app
- System utility (file manager, etc.)
- Game (simple, demonstrate performance)
- ML inference app (Python + UI)
Estimated Effort: 4-6 weeks
TOTAL DOCUMENTATION EFFORT: 10-14 weeks (2.5-3.5 months)
- hello-world (basic)
- webview-demo (good)
Needed:
- Multi-language demo (Python + JS + Go together)
- Real-world app (text editor, image viewer, etc.)
- Performance demo (showing benchmarks)
- Cross-platform demo (showing platform differences)
Estimated Effort: 3-4 weeks
Needed:
- Getting started video
- Building an app walkthrough
- Performance comparison
- Feature showcase
Estimated Effort: 1-2 weeks
TOTAL EXAMPLES EFFORT: 4-6 weeks (1-1.5 months)
| Category | Effort (weeks) | Priority |
|---|---|---|
| CLI Tool | 13-18 | 🔴 High |
| Rust Runtime | 10-13 | 🟡 Medium |
| Java Runtime | 10-12 | 🟢 Low |
| C++ Runtime | 9-10 | 🟡 Medium |
| PHP Runtime | 6-8 | 🟢 Low |
| Ruby Runtime | 7-8 | 🟢 Low |
| Lua Runtime | 4-6 | 🟡 Medium |
| Zig Runtime | 6-7 | 🟡 Medium |
| WASM Runtime | 2-3 (library) | 🟡 Medium |
| Go Runtime | 3-5 | 🟢 Low |
| Build System | 7-8 | 🔴 High |
| HMR | 5-7 | 🟡 Medium |
| Profiler | 5-7 | 🟡 Medium |
| Security | 10-13 | 🟡 Medium |
| Marketplace | 14-18 | 🟢 Low |
| Cloud Services | 19-24 | 🟢 Low |
| Code Signing | 6-8 | 🟡 Medium |
| Update System | 9-12 | 🟡 Medium |
| Documentation | 10-14 | 🔴 High |
| Examples | 4-6 | 🔴 High |
- CLI Tool completion (13-18 weeks)
- Documentation expansion (10-14 weeks)
- More examples (4-6 weeks)
- Build system enhancement (7-8 weeks)
Parallel work possible: 12-18 weeks with good planning
Pick ONE of:
- Rust (10-13 weeks) - Best choice for performance
- C++ (9-10 weeks) - Good for existing libraries
- Lua (4-6 weeks) - Fastest to complete
- HMR (5-7 weeks)
- Profiler (5-7 weeks)
- Security (10-13 weeks)
- Code signing (6-8 weeks)
- Marketplace (14-18 weeks)
- Cloud services (19-24 weeks)
- Update system (9-12 weeks)
| Milestone | Duration | Cumulative | % Complete |
|---|---|---|---|
| Today | - | - | 40% |
| + Phase A | 4 months | 4 months | 60% |
| + Phase B | 3 months | 7 months | 70% |
| + Phase C | 6 months | 13 months | 85% |
| + Phase D | 12 months | 25 months | 100% |
Minimum Viable Product (MVP): Phase A + Phase B = 7 months
Production Ready v1.0: Phase A + B + C = 13 months
Feature Complete: All phases = 25 months
Key Insight: You have ~40% done. The remaining 60% breaks down as:
- 20% = Core polish (CLI, docs, build system) - Critical
- 15% = One more runtime - Important
- 25% = Infrastructure (HMR, profiler, security, signing, updates) - Nice to have
- 40% = Platform services (marketplace, cloud) - Optional
Focus on the first 35% (20% + 15%) to reach 75% and have a truly competitive product.