Notifications
You must be signed in to change notification settings - Fork 39
Expand file tree
/
Copy pathmaximum cost path in a graph.cpp
More file actions
136 lines (110 loc) · 3.25 KB
/
maximum cost path in a graph.cpp
File metadata and controls
136 lines (110 loc) · 3.25 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
// Link to the problem : https://www.techiedelight.com/maximum-cost-path-graph-source-destination/
#include <iostream>
#include <queue>
#include <vector>
#include <set>
#include <climits>
using namespace std;
// Data structure to store a graph edge
struct Edge {
int src, dest, weight;
};
// A class to represent a graph object
class Graph
{
public:
// a vector of vectors of `Edge` to represent an adjacency list
vector<vector<Edge>> adjList;
// Constructor
Graph(vector<Edge> const &edges, int N)
{
// resize the vector to hold `N` elements of type vector<Edge>
adjList.resize(N);
// add edges to the directed graph
for (auto &edge: edges)
{
int src = edge.src;
int dest = edge.dest;
int weight = edge.weight;
adjList[src].push_back({src, dest, weight});
adjList[dest].push_back({dest, src, weight});
}
}
};
// A BFS Node
struct Node
{
// current vertex number and cost of the current path
int vertex, weight;
// set of nodes visited so far in the current path
set<int> s;
};
// Perform BFS on graph `g` starting from vertex `v`
int modifiedBFS(Graph const &g, int src, int k)
{
// create a queue for doing BFS
queue<Node> q;
// add source vertex to set and enqueue it
set<int> vertices;
vertices.insert(0);
q.push({src, 0, vertices});
// stores maximum cost of a path from the source
int maxCost = INT_MIN;
// loop till queue is empty
while (!q.empty())
{
// dequeue front node
Node node = q.front();
q.pop();
int v = node.vertex;
int cost = node.weight;
vertices = node.s;
// if the destination is reached and BFS depth is equal to `m`,
// update the minimum cost calculated so far
if (cost > k) {
maxCost = max(maxCost, cost);
}
// do for every adjacent edge of `v`
for (Edge edge: g.adjList[v])
{
// check for a cycle
if (vertices.find(edge.dest) == vertices.end())
{
// add current node to the path
set<int> s = vertices;
s.insert(edge.dest);
// push every vertex (discovered or undiscovered) into
// the queue with a cost equal to the
// parent's cost plus the current edge's weight
q.push( {edge.dest, cost + edge.weight, s} );
}
}
}
// return max-cost
return maxCost;
}
int main()
{
// vector of graph edges as per the above diagram
vector<Edge> edges =
{
{0, 6, 11}, {0, 1, 5}, {1, 6, 3}, {1, 5, 5}, {1, 2, 7},
{2, 3, -8}, {3, 4, 10}, {5, 2, -1}, {5, 3, 9}, {5, 4, 1},
{6, 5, 2}, {7, 6, 9}, {7, 1, 6}
};
// total number of nodes in the graph
int N = 9;
// build a graph from the given edges
Graph g(edges, N);
int src = 0;
int cost = 50;
// Start modified BFS traversal from source vertex `src`
int maxCost = modifiedBFS(g, src, cost);
if (maxCost != INT_MIN) {
cout << maxCost;
}
else {
cout << "All paths from source have their costs < " << cost;
}
return 0;
}