You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
A pr-workflow run takes about 20 minutes, and a PR waits for two of them (the PR and the merge queue). Jobs don't wait for runners. The time is spent running steps one after another inside each job.
Medians over the last 60 PR runs:
Job
Median
Where the time goes
e2e-test, e2e-test (envoy, preview)
19 min
~5 min setup, then the gVisor lane (6 min) and the micro-VM lane (7.5 min) in sequence
run-tests
17 min
unit tests 6.5 min, then hack/verify-all.sh 5.5 min
Proposed:
Run verify-all.sh in its own job. run-tests drops to about 11 min.
Run each sandbox class in its own e2e job. Each drops to about 12 min. A small job keeps reporting the existing required check names.
Together these should bring a run to about 12 to 13 minutes. Later steps: run the networking suite in parallel (#2687, the longest suite in both lanes), and parallelize the slowest unit-test packages (controlapi, controlapi/functionaltest, ate-setup/internal/steps, about 100 to 200s each, almost entirely serial).
Activity
ekam-walia commentedon Nov 9, 2026
Hi Eitan Yarmush (@EItanya) Aditya Shantanu (@aditya-shantanu), I am happy to handle this issue
Can you please assign this issue to me.
EItanya commentedon Nov 9, 2026
Hey there, I already have 2 PRs covering it, but thank you
ci: run each e2e sandbox class in its own job (#3723)
BenTheElder commentedon Nov 20, 2026
Discussing with Eitan Yarmush (@EItanya) and working on some additional fixes ...
ci: run verify-all.sh in its own job (agent-substrate#3722)
ci: only save caches from main (agent-substrate#4051)
BenTheElder commentedon Nov 21, 2026
caches are now at 9.42GiB in use out of 10GB ceiling, about 4.9GB per commit. That's acceptable.
ci: speed up dynamic module tests by using the image's clang (agent-s…