Add the electricity load as a sink in the complex example#507
Add the electricity load as a sink in the complex example#507Malte96 wants to merge 1 commit intoflixOpt:mainfrom
Conversation
WalkthroughA new electricity demand sink component with fixed relative profile is introduced to a complex example, tied to the electricity demand and integrated into the flow system and build sequence. Changes
Estimated code review effort🎯 1 (Trivial) | ⏱️ ~5 minutes
Poem
Pre-merge checks and finishing touches✅ Passed checks (3 passed)
✨ Finishing touches
🧪 Generate unit tests (beta)
📜 Recent review detailsConfiguration used: CodeRabbit UI Review profile: CHILL Plan: Pro 📒 Files selected for processing (1)
🔇 Additional comments (2)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
|
Thanks @Malte96 for your contribution. |
Description
In the example (Complex example), the electrical demand has not yet been included but is mentioned.
Type of Change
Related Issues
no Issue
Testing
Checklist
Summary by CodeRabbit
Release Notes
✏️ Tip: You can customize this high-level summary in your review settings.