Skip to content

NO-JIRA: trigger etcd-scaling presubmit for OCPBUGS-98719 verification - #31510

Draft
IlanZuckerman wants to merge 1 commit into
openshift:mainfrom
IlanZuckerman:verify-ocpbugs-98719
Draft

NO-JIRA: trigger etcd-scaling presubmit for OCPBUGS-98719 verification#31510
IlanZuckerman wants to merge 1 commit into
openshift:mainfrom
IlanZuckerman:verify-ocpbugs-98719

Conversation

@IlanZuckerman

Copy link
Copy Markdown
Contributor

Empty commit to trigger optional presubmit e2e-gcp-ovn-etcd-scaling and verify OCPBUGS-98719 on 5.0/main.

Will close after verification completes.

Made with Cursor

@openshift-merge-bot

Copy link
Copy Markdown
Contributor

Pipeline controller notification
This repo is configured to use the pipeline controller. Second-stage tests will be triggered either automatically or after lgtm label is added, depending on the repository configuration. The pipeline controller will automatically detect which contexts are required and will utilize /test Prow commands to trigger the second stage.

For optional jobs, comment /test ? to see a list of all defined jobs. To trigger manually all jobs from second stage use /pipeline required command.

This repository is configured in: automatic mode

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Aug 13, 2026
@openshift-ci openshift-ci Bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Aug 13, 2026
@openshift-ci-robot

Copy link
Copy Markdown

@IlanZuckerman: This pull request explicitly references no jira issue.

Details

In response to this:

Empty commit to trigger optional presubmit e2e-gcp-ovn-etcd-scaling and verify OCPBUGS-98719 on 5.0/main.

Will close after verification completes.

Made with Cursor

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci

openshift-ci Bot commented Aug 13, 2026

Copy link
Copy Markdown
Contributor

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

@openshift-ci

openshift-ci Bot commented Aug 13, 2026

Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: IlanZuckerman

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@IlanZuckerman

Copy link
Copy Markdown
Contributor Author

/test e2e-gcp-ovn-etcd-scaling

@openshift-ci

openshift-ci Bot commented Aug 13, 2026

Copy link
Copy Markdown
Contributor

@IlanZuckerman: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/e2e-gcp-ovn-etcd-scaling 19dd797 link false /test e2e-gcp-ovn-etcd-scaling

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants