Skip to content

OCPEDGE-2488: overriding TEST_SKIPS env with an empty list#77026

Merged
openshift-merge-bot[bot] merged 2 commits intoopenshift:mainfrom
Neilhamza:workaround_test_skips
Mar 30, 2026
Merged

OCPEDGE-2488: overriding TEST_SKIPS env with an empty list#77026
openshift-merge-bot[bot] merged 2 commits intoopenshift:mainfrom
Neilhamza:workaround_test_skips

Conversation

@Neilhamza
Copy link
Copy Markdown
Contributor

@Neilhamza Neilhamza commented Mar 29, 2026

the 4.21 periodic lane failure is not related to this PR

the lane e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview contains filtering where we only target tests that contains the label degraded and is in the openshift/two-node suite
but then the ipi-test has a hardcoded list of tests that are not part of the filtered tests above
which result in a "tests not found" error

Signed-off-by: nhamza <nhamza@redhat.com>
@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Mar 29, 2026
@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: This pull request references OCPEDGE-2488 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the story to target the "4.22.0" version, but no target version was set.

Details

In response to this:

the lane e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview contains filtering where we only target tests that contains the label degraded and is in the openshift/two-node suite
but then the ipi-test has a hardcoded list of tests that are not part of the filtered tests above
which result in a "tests not found" error

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci bot requested review from smg247 and sosiouxme March 29, 2026 10:43
@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.21-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.22-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.23-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-5.0-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.22-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-5.0-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.21-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.21-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-5.0-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-5.0-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

Signed-off-by: nhamza <nhamza@redhat.com>
@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-5.0-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.21-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.22-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.23-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-5.0-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.21-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.22-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.23-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse periodic-ci-openshift-release-main-nightly-4.21-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: This pull request references OCPEDGE-2488 which is a valid jira issue.

Warning: The referenced jira issue has an invalid target version for the target branch this PR targets: expected the story to target the "4.22.0" version, but no target version was set.

Details

In response to this:

the 4.21 periodic lane failure is not related to this PR

the lane e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview contains filtering where we only target tests that contains the label degraded and is in the openshift/two-node suite
but then the ipi-test has a hardcoded list of tests that are not part of the filtered tests above
which result in a "tests not found" error

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@jaypoulz
Copy link
Copy Markdown
Contributor

/lgtm
/approve

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Mar 30, 2026
Copy link
Copy Markdown
Member

@petr-muller petr-muller left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/approve

@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci bot commented Mar 30, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: jaypoulz, Neilhamza, petr-muller

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Mar 30, 2026
@Neilhamza
Copy link
Copy Markdown
Contributor Author

/pj-rehearse ack

@openshift-ci-robot
Copy link
Copy Markdown
Contributor

@Neilhamza: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Mar 30, 2026
@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci bot commented Mar 30, 2026

@Neilhamza: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/rehearse/periodic-ci-openshift-release-main-nightly-4.21-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview 0ef1f44 link unknown /pj-rehearse periodic-ci-openshift-release-main-nightly-4.21-e2e-metal-ovn-two-node-fencing-degraded-tn-suite-techpreview

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-merge-bot openshift-merge-bot bot merged commit 5c428c3 into openshift:main Mar 30, 2026
16 of 17 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants